Outlets of Mississippi Sitework
Bloomfield Holdings, LLC
Mississippi Economic Authority and Nissan North America
Yates Construction served as Construction Manager for Phases I and II of the site-work package for the Nissan Assembly Plant. Phase I included clearing, grading, stormwater, and lime stabilization. Clearing and grading consisted of 150 acres, with more than 1,000 linear feet of stormwater conveyance and drainage placed. The project scope included moving approximately 2.5 million cubic yards of soil and spreading 94,000 tons of lime. Phase II included the balance of site work, grading, drainage, water, sewer, and paving. During the paving phase, the project required more than 330,000 tons of asphalt.