Nissan Assembly Plant

Nissan North America

Yates Construction and our joint venture partner provided construction services for the Nissan Automotive Manufacturing Facility. This two-phase project totaling 3.3 million SF consists of a body shop, assembly building, paint building, stamping building, central utility building, administration area, and logistics area. The project included installing 18,000 tons of structural steel, 90,000 cubic yards of reinforced concrete, 18,000 tons of air conditioning, and two million linear feet of electrical conductor. The project’s scope also included equipment pits, a primary switchgear, a water tank, utility trestles, a process tank farm, and caisson foundations for all presses and production conveyors.

Location
Canton, Mississippi
Size
3,300,000 SF
Industries